Recently

Filter your search:
  • - Article

    Options for future offshore grid

    Statnett is stepping up its collaboration with five Transmission System Operators (TSO´s) surrounding the North Sea, to investigate potential grid solutions of hybrid connections foroffshore wind....

  • - Article

    Statnett SF - Results first half-year of 2023

    The Statnett Group's underlying profit after tax amounted to NOK 970 million in the first half of 20 2 3 , almost double compared to the first half of 2022. At the same time, reduce d congestion...

  • The NSL cable between Norway and the UK will return to full operations on Tuesday 13 th June after a technical fault at the plant in Suldal in Norway was repared.

  • A fault resulted in the unavailability of the NSL interconnector between Norway and the UK Thursday afternoon. The fault resulted in the need to replace a component. Until this has been done, the...