In the spring of 2021, Statnett worked on a first draft of our framework for assessing and processing connections with conditions. The framework has been created based on provisions in the Regulation on grid regulation and the energy market (NEM) and is therefore not subject to the same requirements as the guidelines that follow from FOS (Regulation on system responsibility in the power system)