We currently have one power line running along the section, with a voltage level of 132 kV.

The reason for initiating the licensing process is a short-term need for reinvestment/renovation of the existing power line and an assumed long-term need for multiple power lines along the section.

Reports from analyses of needs and projects for the power system in Finnmark have not drawn a final conclusion as to the required voltage level from Adamselv to Lakselv, and consequently, impact assessments are being conducted for both new 132 kV and 420 kV power lines.